Transforming 1.2 kilometres of waterlogged clay land into productive arable ground.

1,200 m
Pipe Drain
32 Ha
Area Treated
2m Centres
Mole Spacing
500–600mm
Depth

Scope of Works

  • Topographic survey and drainage design
  • 1,200m perforated pipe drain installation (600mm depth)
  • Mole drainage on 2m spacing (500mm depth)
  • Gravel backfill to pipe trenches
  • New outfall connection to ditch network
  • Inspection chambers at junctions
  • Reinstatement and surface restoration

This intensive field drainage project addressed chronic waterlogging issues across 32 hectares of heavy Cambridgeshire clay. Our drainage specialists undertook a comprehensive survey and design process before installing 1.2km of perforated pipe drain at 600mm depth, feeding into a new main outfall to the existing ditch network. Mole drainage was then carried out at 500mm depth on a 2m spacing, dramatically increasing the infiltration capacity of the clay sub-soil. The result is a field that previously lost 3-4 weeks of cropping opportunity per season now drains effectively within 24 hours of significant rainfall. All work was carried out to DEFRA stewardship standards, with minimal surface disturbance to surrounding headlands.

Transforming 1.2 kilometres of waterlogged clay land into productive arable ground.

1.2
km of pipe drain
Perforated pipe at 600mm depth feeding to outfall
32
Hectares treated
Heavy clay arable land now draining within 24 hours
2m
Mole spacing
Sub-soil mole drainage to maximise infiltration

Start Your Project

Let’s Build
Something Exceptional

Request a free site survey and discover what RL Civils & Sons can deliver for your project.

Request a Free Survey