Groundworks & EarthmovingLincolnshire Farm

Large-Scale Earthmoving

Fifty thousand cubic metres of precision earthmoving. Eight weeks. Zero overruns.

50,000 m³
Volume
8 Weeks
Programme
±25mm
Tolerance
12 Machines
Plant

Scope of Works

  • Site strip and topsoil storage
  • 50,000m³ cut-and-fill earthmoving programme
  • GPS-guided precision grading to ±25mm
  • Formation level preparation
  • Topsoil respread and reinstatement
  • Site access track construction

This landmark agricultural earthworks project required the movement and redistribution of 50,000 cubic metres of soil across a challenging undulating Lincolnshire site. Our team undertook a comprehensive cut-and-fill programme, engineering a level platform suitable for a major new farm building complex. Working to a tight 8-week programme agreed with the client, our fleet of specialist plant — including D8 dozers, scrapers, and articulated dump trucks — maintained a relentless pace throughout. Precise GPS-guided grading ensured every cubic metre was placed to within ±25mm tolerance, creating a formation level ready for immediate groundwork follow-on. The project was completed on programme and within budget, enabling the client to proceed with the next phase of their agricultural expansion without delay.

Fifty thousand cubic metres of precision earthmoving. Eight weeks. Zero overruns.

50K
Cubic metres moved
Complete cut-and-fill redistribution across the site
8
Week programme
Delivered on time enabling immediate follow-on works
±25
mm tolerance
GPS-guided precision grading throughout